I really, really want to finish the Elysium so that I can include it in my yearly knitting total. Right now without that finished project, I am at 13, 903 metres this year. If I can include it in my knitting total, then I will be 826 metres which would bring my total up to 14, 729 m. And then I would have to have only a very very little bit to knit, 300 metres to get to 15000.
I'm not to worried about reaching the 15. I have probably forgotten to add enough projects to cover the difference, but this thousand is vital to get close enough to the total to call it done. I am going to work really hard to get the Elysium completed for two reasons. A. I really want to get close to the 15, and B. I really really want to wear it. It is going to be grand. I can tell.
No comments:
Post a Comment